Paver Calculator
    Calculate paver jobs by plugging in your specs below

 

 

 

Fill in the blanks below to calculate your paver job. Start at the top and work your way down.  You will need manufacturer specifications
for some of the information.  Those specifications can be found on the manufacturer's website or in their product catalog.

_____________________________________________________________________________

Base Materials Calculator

Enter the base square feet
(Remember it needs to be 6 inches wider than the paver area on all sides)

Enter the depth of the base in inches


Are you going to use a border?


Border Calculator

This is used to calculate the pavers needed to create a soldier or sailer course as a border around the paver field. 
If you are not using a border course, leave these blank.

 

Enter the length of the border in feet

Enter the square feet per pallet

Enter the width of a piece along the border in inches

Enter the length of the piece in inches

Paver Pattern Calculator

If you are only paving with one shape or are using a product that has blended sizes on one pallet, then only fill in the blanks for "Paver A."
If you are using a pattern that requires two or three different shapes on separate pallets, then fill in the blanks for "Paver A," "Paver B,"and "Paver C."

 

Enter the job square feet

Enter the percent increase for cuts

Enter the square feet per pallet of Paver A

Enter the square feet per pallet of Paver B

Enter the square feet per pallet of Paver C

Enter the percentage of Paver A used in the pattern

Enter the percentage of Paver B used in the pattern

Enter the percentage of Paver C used in the pattern

Press the calculate button and your results will appear below.

_____________________________________________________________

 

Materials Summary

Base Materials

Cubic yards of base stone needed is:

Cubic yards of base sand needed is:

Border Information

Pieces needed for border:

Square Feet Covered

Pallets Needed:

Paver Field Information

Pavers required with cuts: SqFt

Pallets of A needed:

Pallets of B needed:

Pallets of C needed:

Polymeric Sand

Narrow joints: tobag(s)

Wide joints: tobag(s)